Our service area in Naples: 60 towns, three counties, a dozen permit desks
Naples is home base, and the work runs north through Lee County into Charlotte County. Each town below has its own page covering the local permit office, the ground and the rules that apply there. The town name matters less than the desk that reads your plans.
Inside the City of Naples, pool permits go to the city's building department electronically, through its public portal. Outside the city, Collier County treats a pool permit and a screen enclosure permit as two separate things. Lee County runs everything through its eConnect system. Charlotte County, Punta Gorda, Cape Coral, Sanibel, Fort Myers Beach, Estero, Bonita Springs, Fort Myers and Marco Island each keep a desk of their own. Because one street can straddle a city line, we look up the parcel and find the right desk before we price a job.
Our permit guide covers the filing steps that stay the same at every address.
Collier County: the city desk, the county desk and the island desks
The City of Naples checklist wants a site plan showing the crown of the road, finished floor and pool elevations, plus signed and sealed structural details and a barrier plan. A pool and deck over 1,000 sq ft needs an inspected temporary construction fence before the permit issues. Once the slab goes in, work stops until an Elevation Certificate and a Spot Survey are approved. A screen enclosure counts as an accessory structure and gets its own permit.
Unincorporated Collier does it differently. The county's pool permit wants engineered structural detail, TDH calculations and the pump curve, and a screen enclosure falls under its own Aluminum Structure permit. Marco Island runs its own building services with a Civic Access Portal. Everglades City hands its inspections to Collier County staff.
Collier County towns we serve:
Lee County: eConnect, sealed plans and a city desk at almost every turn
Every in-ground pool in unincorporated Lee County needs a Residential Pool permit, filed through eConnect with signed and sealed plans and hydraulic calculations. Its pool guide also calls for a separate enclosure or fence permit, and a vegetation removal permit on any barrier island. An issued permit lapses unless the job passes an inspection within 180 days.
The cities add wrinkles of their own. Cape Coral asks for a Burrowing Owl and Gopher Tortoise affidavit. Sanibel wants a vegetation and wildlife plan. Fort Myers Beach accepts applications only through its online portal and asks for a stormwater plan. Estero lists pools and cages as permit work, and Bonita Springs and Fort Myers each run their own building division.
Lee County towns we serve:
Charlotte County: one county desk and the City of Punta Gorda
Charlotte County uses the 2023 Florida Building Code with no local amendments. Its residential pool permit asks for a site plan with setbacks, TDH calculations and drain-cover paperwork. Projects in Coastal A or V flood zones need signed and sealed engineering. Building review looks at wind and flood loads. Zoning and right-of-way are separate reviews.
Inside the City of Punta Gorda, the Building Division takes over. Its fee list shows $200 for a pool and $200 for an aluminum cage, and four times the fee if work starts without a permit. It doesn't take applications online. Our crew checks the city limit on your parcel before we promise a schedule.
Charlotte County towns we serve:
Beaches and islands add a state step
Some of our service area in Naples faces the Gulf directly. The Florida Department of Environmental Protection draws the coastal construction control line, and a pool seaward of it can need a state permit on top of the local one. Collier County and Lee County each have their own general permit line in the state's administrative code. The City of Naples says pool projects west of the line may need prior approval from the state and from the city's natural resource manager.
Whether your lot is seaward is the state's call. It isn't ours, and it isn't a neighbor's. The state does allow general permits for some work, with notice at least 30 days before you start, so we put that wait on the calendar. Open one of these beach and island pages first: Marco Island, Vanderbilt Beach, Bonita Beach, Fort Myers Beach, Sanibel, Captiva and Boca Grande.
What stays the same at every address
Some things hold across the whole service area around Naples. A new residential pool in Florida needs at least one safety feature under F.S. 515, and the permit guide lists the options. Someone calls Sunshine 811 before anyone digs, and Florida's one-call law asks an excavator to notify the system at least 2 full business days ahead. The owner records a Notice of Commencement before work starts on any improvement over $2,500. The Atlantic hurricane season runs June 1 to November 30, so we plan cages and equipment around it. We draw cages and decks to the wind code laid out in our cage code guide, and the cost guide explains what moves a price. A written estimate always comes before any work begins.
Is your street inside the service area near Naples?
Is your town on the lists above? Call (239) 899-6371 or use the contact page and give us the address. Not listed? Call anyway. We'll say whether we take the job and which office would permit it, then walk the yard and send a free written estimate.
You can also browse the work by trade on the new pool construction, pool renovation, pool resurfacing, screen enclosure, pool deck, spa and water feature and pool design pages. Our service area in Naples is wide, and the estimate is always free. If you have a survey or any association papers, bring them along.
Sources
- Pool (PRSPL) application requirements, Collier County Growth Management
- Aluminum Structures (PRAS), Collier County Growth Management
- Pool (Residential and Commercial) Application and Permitting Guide, Lee County Community Development
- Residential Pool or Spa, Charlotte County Community Development
- Building Permit Fee Structure, City of Punta Gorda
- Coastal Construction Control Line Program, Florida Department of Environmental Protection
- Section 161.053, Coastal construction and excavation, Florida Legislature
- Building Services, City of Marco Island