Serving Pelican Bay & Collier County  |  Call Now: (239) 899-6371
📞 (239) 899-6371
Pool Decks in Pelican Bay, FL
Pelican Bay, FL

Pool Decks in Pelican Bay, FL

Paver and travertine decks sloped to shed water off the shell and the lanai. 25+ years of experience. Free estimates.

Fully Insured
Free Quotes
5-Star Google Rated

Get Your Free Pelican Bay Estimate

Tell us about your project and we'll get back to you with a detailed, no-obligation quote.

  • 100% free, no-obligation estimates
  • Insured and locally owned
  • Transparent pricing — no hidden fees
  • Collier County pool construction experience

Request Your Free Quote

Fill out the form below — we'll reply with a no-obligation quote.

Quick answer

At the 2020 census, four in ten Pelican Bay homes stood vacant, so your calendar comes first on a job here. Naples Swimming Pool Construction Co lays paver and travertine pool decks in Pelican Bay, files the Collier County permit, and gives you a free estimate after we've walked the yard.

Pool decks in Pelican Bay for houses that sit quiet part of the year

Pelican Bay sits between the Gulf of Mexico and US 41, with Vanderbilt Beach Road along the north edge and the city of Naples to the south. In the 2020 census, 42.8 percent of its 6,634 housing units were vacant, and 78.1 percent of residents were 65 or older, per the Pelican Bay census summary. That's a lot of empty lanais, so timing matters as much as the stone.

Paper comes first. Before work begins you get a written estimate, a surface you can pick from wherever you are, and a start date we've all agreed to. Tell us who holds the gate code and when you'll be home. The Pelican Bay page covers the rest of what we build here, and the service page for decking lines the surfaces up side by side.

Gulf on one side, US 41 on the other: what the flood map means for a deck

A flood zone can change over a short distance. At one Gulf-side sample point in Pelican Bay, FEMA's layer showed Zone VE with a base flood elevation of 14 feet. At two inland points it showed Zone X, outside the mapped high-risk area. Those are spot checks, not rulings on your lot, so look up your own address on FEMA's flood hazard layer before you plan anything.

So what does that mean for a deck? Collier's under-$7,500 exemption letter doesn't reach property in a flood hazard area, so on a VE lot, small work that would otherwise qualify for that letter still needs a permit. If your lot is seaward of the state's Coastal Construction Control Line, F.S. 161.053 lets FDEP issue general permits for decks, and the notice goes in at least 30 days before work starts. The county and FDEP can tell you which side of that line you're on. We don't guess.

Pavers, travertine and the sand underneath

The soil survey lists Immokalee fine sand mixed with urban land at one Pelican Bay sample point and Satellite fine sand with urban land at another. The survey rates them poorly and somewhat poorly drained. If a puddle sits against the lanai door, the surface was sloped wrong. We set the fall away from the shell and the house first, then build the base to match.

Expect $8 to $14 per square foot for concrete pavers and $14 to $30 for travertine. Pale colors stay kinder to bare feet than dark ones in afternoon sun, so we leave a sample out in the sun before you choose. Pavers lift and reset if a line or a root needs attention underneath. Take a 600 sq ft travertine surround: at $14 to $30 per sq ft that's $8,400 to $18,000. Our pool cost guide shows where decking fits in a full build.

What Collier County asks for when the deck rides on the pool permit

Pelican Bay is unincorporated Collier County, so the permit goes through Collier Growth Management. The application has you name the deck material, with wood, concrete or sand-set pavers listed, which puts the surface on paper before anyone orders stone. If a job adds more than 400 sq ft of new impervious area, the site plan must be certified, signed and sealed, and no more than six months old. One- and two-family lots also get asked for stormwater plans, with some exceptions. Collier's pool permit page has the full list.

We pull the permit and book the inspections. Changing the deck doesn't suspend the barrier rules: under Florida's pool safety chapter, a gate has to open outward and close and latch on its own. Our permit guide walks through the permit steps for Collier and Lee towns.

Ready for pool decks in Pelican Bay? What to have on hand

Call (239) 899-6371 and we'll pick a time to walk the yard. Pull a few things together first:

  • Photos of today's surface and the lanai door thresholds
  • Rough length and width, or your last survey
  • A color you're leaning toward
  • Your association's architectural guidelines, if you have a copy
  • Which months you'll be away

With that in hand we can quote pool decks in Pelican Bay as a free written estimate. Planning a bigger refresh? We'll cover screen enclosures in Pelican Bay or resurfacing the shell on the same visit.

Pool Decks Pricing in Pelican Bay

Transparent pricing for pool decks & pavers in the Pelican Bay area.

Typical Southwest Florida ranges for a Pelican Bay surround. Your free written estimate comes after we see the yard.

SurfaceTypical rangeWhat moves the price here
Concrete paver deck$8 to $14 per sq ftPattern, base work and the slope away from the house
Travertine deck$14 to $30 per sq ftStone grade, pattern and fall
600 sq ft travertine deck$8,400 to $18,000The per sq ft range multiplied by the area
1,000 sq ft paver deck$8,000 to $14,000The per sq ft range multiplied by the area
Whole deck, typical job$8,000 to $30,000Size, taking out the old surface, and the permit route if the lot is in a flood hazard area

These are typical ranges, not quotes. The free estimate is written once we've seen the yard.

Why Homeowners Choose Naples Swimming Pool Construction Co

25+ Years Experience

25+ years building custom inground pools. In Pelican Bay that means surrounds that shed water away from the lanai door.

Fully Insured

We carry general liability and workers' compensation coverage. Ask for a certificate and we'll send one.

Free Estimates

You get the estimate in writing before work begins, so you can approve it from wherever you are.

We Pull the Permit

We file with Collier County and see each inspection through, so an empty house doesn't stall the schedule.

What to Expect, Start to Finish

01

Walk it with your calendar

We measure, check the lanai doors and drains, and ask when you'll be home.

02

Pick the surface

Pavers or travertine. We leave samples out in the sun so you see the color before you commit.

03

Permit and association

We file with Collier Growth Management. You send your association the materials list.

04

Call 811, then pull the old surface

Sunshine 811 marks the lines before we dig. Then the old surface comes out and the new base goes in.

05

Set, cut and fall

Pavers or stone go down on a slope that sheds water away from the shell and the house.

06

Inspection and walk-through

We book the county inspection, then walk the finished surface with you or whoever you name.

Pool Decks & Pavers Projects Near Pelican Bay

Recent pool decks & pavers work in the Pelican Bay area.

Large-format porcelain pavers and coping at a Naples, FL pool
Large-format porcelain pavers and coping at a Naples, FL pool
Paver pool deck with outdoor furniture in Naples, Florida
Paver pool deck with outdoor furniture in Naples, Florida
Wraparound paver pool deck at a luxury Naples, FL home
Wraparound paver pool deck at a luxury Naples, FL home

What Our Clients Say

5.0 out of 5 from 14 Google reviews See all reviews on Google

  • We were up north for most of the construction and I was nervous about doing a pool long distance. The team made it easy. Every couple of days we got photos and a quick update on where things were, and when the inspection got pushed a week they called to tell us before we had to ask. The project manager answered every one of my questions, even the dumb ones about chlorine versus salt, and never made me feel rushed. When we finally flew down the first thing we did was walk out back, and it looked exactly like the drawing. The tile line is straight, the deck stays cool on bare feet, and the waterfall is my husband's favorite part. Our grandkids spent the whole Thanksgiving week in it. Hard to trust a contractor with something this big from a thousand miles away, but we did and it paid off.
    W. · Google review · Oct 2026
  • From the first meeting they were straight with us about cost and timeline, no surprises later on. They told us about 10 weeks from dig to swim and it was right around that. Every time we were told someone would be out, they were there, usually early. The crew was respectful of our neighbors, kept the street clear and swept the driveway at the end of every day. The owner came by himself several times during the build to check on things. We're very happy with the pool and the screen enclosure, and we've already had the neighbors over twice to show it off.
    Marylynn · Google review · Oct 2026
  • Our lot sits low so drainage was my big worry going in. They raised the deck a few inches and sloped everything toward the yard, and after the last storm there wasnt a drop of standing water around it. Took about two months total, which is what they said at the first meeting.
    Kids · Google review · Oct 2026
  • Installed a pool for when our grandkids come and visit. We end up using it a lot more than we originally thought we would, it has brought so much joy into our lives! Very happy with the work done by these Naples pool builders, and I recommend them to anyone that needs a reputable pool contractor in Naples.
    WillStreams · Google review · Jul 2025
  • Start to finish, the process was smooth and low-stress. The team was super responsive, showed up when they said they would, and really knew what they were doing. If you’re looking for pool builders in Naples who keep it simple and do solid work, this is it. Their eye for custom pool design made all the difference.
    Will · Google review · Jul 2025
  • With three kids under 15 and a chaotic schedule, I honestly didn’t have time for a stressful construction project. But I kept seeing Naples Swimming Pool Construction Co pop up when I searched for pool contractors near me, and after one call with them, I felt way more confident. They helped with the design, permits, even dealt with my HOA (which was a whole thing). The kids are obsessed with the pool now, and it’s actually given us way more quality time together. If you’re in the same boat, juggling work and family and searching for pool companies Naples, I can’t recommend them enough!
    Emilia · Google review · Jun 2025
  • I didn’t realize how bad we needed this pool until it was done. Naples Swimming Pool Construction Co made it easy from start to finish. They showed up when they said they would, didn’t cut corners, and the design came out way better than we pictured. Our yard is basically a resort now. If you want solid pool contractors in Naples, this the crew to call.
    Emily · Google review · Jun 2025
  • So we’ve never built a pool before, had no clue what to expect. We talked to a few pool contractors near me and a couple felt off — pushy, not really listening, kinda just quoting us without any real plan. Then we met the team at Naples Swimming Pool Construction Co, and they were just different. Relaxed, honest, super easy to work with. There were a couple small delays (weather mostly), but they kept us updated and made sure the quality was never rushed. The final pool honestly turned out even better than the pictures. If you’re in Naples and want pool contractors Naples folks actually recommend, don’t think twice.
    Stephanie · Google review · Jun 2025
  • I was honestly nervous about hiring anyone… pool projects can go sideways fast. I typed in pool companies near me and ended up calling Naples Swimming Pool Construction Co kinda on a whim. Glad I did. From the start, they actually listened — like, listened listened. Didn’t try to sell me stuff I didn’t need. Didn’t rush through anything. They took their time explaining things and helped me figure out what would work best for my space. And now? The pool looks insane. So happy with how it turned out. If you’re looking for pool companies Naples that won’t treat you like just another job, they’re the ones.
    Bavmordis · Google review · Jun 2025
  • I still can’t believe this is my backyard. When I started looking for pool builders in Naples FL, I had no idea who to trust. So many Naples pool companies sounded the same, but what set Naples Swimming Pool Construction Co apart from the start was how personal they made the process. They really listened — not just to what I wanted the pool to look like, but to how I wanted it to feel. What you see in this photo is more than just clean lines and beautiful water. It’s where I sip coffee in the morning, where my kids splash around in the afternoon, and where we host friends on weekends. This pool brought life back into our home. Their team was incredibly professional and walked me through every step of the pool construction in Naples FL process — from permits to design to the final finish. They even helped me navigate local codes, which was a lifesaver. If you’re like I was and Googling “swimming pool contractors near me” or “reliable pool contractors Naples FL,” just stop here. You found them. The craftsmanship is unreal. Every line is clean, the water circulation is perfect, and the finishes feel custom — because they are. This isn’t a cookie-cutter pool, it’s my pool. And I’m honestly proud to show it off. Can’t say enough about the team at Naples Swimming Pool Construction Co. If you’re considering working with any other Naples pool builders, do yourself a favor and at least give these guys a call. They’re the real deal — and my pool proves it.
    Jadden · Google review · May 2025
  • Choosing Naples Swimming Pool Construction Co. was honestly one of the best choices we’ve made for our home. We talked to a few pool builders in Naples, but right away we could tell this team actually cared. No pressure, no sales-y stuff—just real advice and a good feel for what we were trying to do. We were going for a modern, clean look to match our home and they nailed it. The layout is exactly what we wanted, super clean lines, and the finish just pops when the sun hits the water. You can tell these guys know what they’re doing. Every detail was on point. Seriously, this is a pool construction company in Naples that takes their work seriously. The whole process was surprisingly smooth. They kept us updated without us having to chase anyone down, and always showed up when they said they would. Even when we had last-minute questions or small changes, they handled it without making us feel like we were being a pain. We really appreciated that. Now that the pool’s done, our backyard honestly feels like a little resort. We’ve already had friends and family ask who did it. If you’re looking for solid, honest pool contractors in Naples who do clean, high-quality work and actually listen—these are your people. Big thanks to the whole crew at Naples Swimming Pool Construction Co. They made the whole experience easy and actually kinda fun. Highly recommend them if you’re looking to build a pool in Naples.
    George · Google review · May 2025
  • Working with Naples Swimming Pool Construction Co. was such a smooth and stress-free experience. We had a pretty specific vision for our pool, and they brought it to life better than we imagined-including a beautiful pool cage that ties everything together perfectly. The communication was solid the whole time-no guessing games or waiting around wondering what s next. The team showed up when they said they would, worked hard, and kept everything clean and organized. Now every time we step outside, it feels like a dream. If you re in Naples and thinking about a pool, this is the company you want on your side.
    TaNieyah · Google review · May 2025
Call (239) 899-6371

Frequently Asked Questions

Can pool decks in Pelican Bay be built while we're away for the summer?
Yes, if there's a plan. First you approve the written estimate and the surface. We pull the permit, and you tell us who holds the gate code. NOAA puts hurricane season at June 1 to November 30, so we also settle ahead of time how loose pavers and stacked stone get secured when a storm is forecast. Give us your travel dates and we'll build the schedule around them.
Does the Gulf-side flood zone change how a Pelican Bay surround is built?
The paperwork changes more than the paving does. At one Gulf-side sample point FEMA's layer showed Zone VE with a 14 foot base flood elevation, and at two inland points it showed Zone X. Collier's under-$7,500 exemption leaves out flood hazard areas, so small work there that would otherwise qualify still needs a permit. Look up your address on FEMA's layer and we'll work from what it says.
Does my Pelican Bay association have to approve new decking?
We can't read your association's rules for you, so ask it for the architectural guidelines. For a homeowners' association, F.S. 720.3035 keeps its review to what its documents say and bars it from restricting a choice among materials those documents allow. Send us the guidelines and the color list and we'll quote from them.
Do I need a certified site plan to replace a deck in Pelican Bay?
When a pool submittal adds more than 400 sq ft of new impervious area, Collier wants a certified site plan, signed and sealed, no older than six months. Replace the deck in the same footprint and you add none. A bigger surround might. Growth Management decides for your address, and we'll ask before we price any footprint change.
Which stays cooler in afternoon sun, pavers or travertine?
Color matters more than the material. Pale stone and light pavers are kinder to bare feet than dark ones, and a rough face grips better when wet. At your house we leave samples in the afternoon sun so you can put a hand and a foot on them before you choose.
Can new stone go over my old Pelican Bay surface?
Sometimes, if the old base is sound. Each inch of build-up rises against the lanai door sills and the cage track. Florida's residential code measures a barrier on the side away from the water: at least 48 inches above grade, no more than 2 inches of gap below. New stone that runs past the fence or cage line raises that grade. We measure the fence, the cage track and the door sills first, then tell you whether there's room to build up or the old surface has to come out.

Ready for a new Pelican Bay deck?

Call (239) 899-6371 for a free written estimate. Tell us which months you're away and we'll plan around them.

📞 Call (239) 899-6371 Request Quote Online
📞 Call Now Get Quote
Free Quote